DAP® 4000 Subfloor & Deck Construction Adhesive
- Reduces nailing, floor squeaks & nail pops
- Bonds wet, frozen and treated lumber
- Easy gunning
- High strength, weatherproof bond
- Meets APA AFG-01
Packaging: 10.3 fl. oz. (305 mL), 29 fl. oz. (856 mL)
Color: Tan
UPC Number: 0 70798 25020 8, 0 70798 25117 5
Product Description:
DAP® 4000® Subfloor & Deck Construction Adhesive is a premium grade, weatherproof formulation which meets APA, The Engineered Wood Association, Specification AFG-01 for subfloor construction. It reduces nailing requirements, floor squeaks and nail pops. Forms a permanent bond on wet, frozen and treated lumber.
Easy gunning. Interior/exterior use.
Suggested Uses:
- Bonds:
- Wood to wood assemblies
- Glued floor systems
- Lumber and treated lumber
- Metal
- Plaster
- Masonry
- Drywall
- Ceramic Tile
- Plywood
- Waferboard
- Particleboard
- Concrete
For Best Results:
- Apply in temperatures above 0°F.
- Keep adhesive at or above 40º F prior to use for easier gunning.
- Not recommended for applications other than subfloor, deck and wall installation.
- Not for continuous water submersion.
Surface Preparation & Application:
1. Surfaces must be clean, structurally sound and free of foreign material.
2. Pre-cut and fit materials before applying adhesive.
3. Trim nozzle to desired bead size. 3/8” bead is recommended for subfloor applications.
4. Puncture inner foil seal
5. Load cartridge into caulking gun.
6. Apply a continuous bead to joists, studs or backside of siding or panels.
7. Within 15 minutes, position and press substrates firmly into place. If left open longer than 15 minutes,
scrape off and reapply.
8. Install nails or screws within 15 minutes.
9. Allow to dry for 24 hours before exposing to heavy traffic.
Application Tips:
Tongue & Groove Subfloor: Use a 3/8” continuous bead on joists. Use ample bead of adhesive in all grooved channels (remove excess squeezed out adhesive before it dries.) Panel joints should not be tight. Allow 1/8” gap for expansion. Position and nail or screw within 30 minutes. Proper installation methods for subfloorings must be followed.
Decks: Use 1/4” adhesive bead on every joist for additional strength and to prevent squeaks. Nail planks at every other joist. Pre-drill nail holes.